0086-13102279656


contact@beijing-market.com
PIONEER ENERGY
High Pressure and High Temperature (Ultra-Deep) Well Control Equipment
Solution
The construction of high-production oil and gas fields depends heavily on ultra-deep well drilling operations, which involves complex working conditions such as ultra-high pressure and high temperature. Well control equipment such as large-diameter blowout preventer stacks and manifolds for ultra-high-pressure, and high-temperature conditions are required for drilling large boreholes and installing multiple casings.
Solution Brief
For ultra-deep well drilling with ultra-high-pressure, and high-temperature conditions, we provide blowout preventer and pipe manifolds including 175MPa (25000psi) ram preventer, 140MPa (20000psi) blowout preventer stacks, 105MPa (15000psi) blowout preventer stacks, 21 1/4-10000psi large diameter blowout preventer stacks for high pressure condition, 26 3/4"-3000psi large diameter ram preventer, 29 1/2"500psi and 30"1000psi diverter as well as high temperature seals up to BFF (350°F/177°C).
Performance level
PR1、PR2
Pressure range
Maximum working pressure 25000psi(172.4MPa)
Temperature range
Maximum working temperature 350°F (177℃)
Bore size range
7 1/16" -30"(179mm - 762mm)
Products

Large bore size Ram BOP


View→

29 1/2"-500psi Diverter


View→

54-70 Large bore size High-pressure BOP Stack


View→

Related Solutions



Gas Sealing Well Control Equipment Solution



View more →



High Sulfur-Resistant Well Control 

Equipment Solution



View more →



Well Control Equipment Solution for Continuous Tubing Operations


 

View more →



Intelligent Control System Solution



 

View more →



Solutions for Hydraulic Locking of Ramp 

BOP



 

View more →



Well Control Equipment Solution for High-Capacity Shear



 

View more →



Well Control Equipment Solution for Extremely Cold Regions



 

View more →